Sunday, September 2, 2012

Khao Nam Khang Tunnel Ride 01-09-2012

the convoy picture 4 riders from Butterworth and 8 from BLMer
5.38am we reached our meeting point
 we reached the CTC money changer and coffee on the house
 new CRV carry 1 bike, the other CRV 4 bikes and the trunk carry7 bikes
 at the Malaysia custom declaration department
 at The Thai custom for vehicle declaration
 we reached Sadao for breakfast
 miniture yew char kuek
 porridge with meat, liver and eggs " Kaw tum"
 pork pau
 at the porridge shop they can't recede
 with the stomach full of foods 
 everyone are excited to go
 waiting for some riders got lost
 friend from Butterworth
 Wah from Butterworth
 Also from Butterworth
 Kong from Butterworth
 Scrap Low
 Siam Seng
 KS Lim
 Simon Chin
 Boon Liang
 our new member Toh
 Engineer Poh
 Captain Sin
 support car provide cool soft drink this is the point where the road start ascending 
 this part is the highest peak of all ride
 Boon Liang's rear tyre puncture
 the T junction to the tunnel and you can see the asending road when going back
 main road at the junction
 at the entrance still 2 more kilo to the tunnel
 reached the tunnel
 refreshment time for some rider
 some went in touring the historist tunnel
 some take picture
 ex-communist 2 from salak south and 1 from padang lembu
 exhausted rider due to the heat
 leg cramped rider



Monday, July 16, 2012

SP Saza Mountain Bike Jamboree 14/07/2012

our group photo

at frontline scenery

at backline scenery

at the starting point and flagoff 7.49am

one of the climbing hill
they called Bukit Pengsan

our group first to finish Tak Milk Man finishing medal 185

second Honda Keat finishing medal 198

third Captain Sin finishing medal 218 (2hr 23min)

fourth Holy Teoh finishing medal 252 (2hr 27min)

fifth Engineer Poh finishing medal 254 (2hr 27min)

sixth Scrap Low finishing medal 255 (2hr 27min)

seventh Choon NCN finishing medal 366 (2hr 40min)

eigth Siam Seng finishing medal 373 (2hr 41min)

tenth Kent Lim finishing medal 377 (2hr 42min)

eleventh Safety Pin finishing medal 474 (2hr 50min)

twelfth Boon Liang 2hr 57min

thirteenth Oh 2hr 58min

fourteenth KS Lim 3hr 23min

fifteenth Simon Chin 3hr 37min

sixteenth Ben Lim 3hr 43min

after the ride

track profile and with 1353 participants

google earth track distance 42 km

Tuesday, June 19, 2012

Betong Trip 17/06/2012


 route profile
  
distance covered 43 km
at Malaysia Immigration check point
at Betong Immigration check point
at Piyamit 1 monument
at Piyamit 2 "Winter Flower Graden" Restaurant